low |
Kipling Avenue |
|
13/08/2024 12:00am |
14/08/2024 11:59pm |
Virgin Media |
medium |
Argyle Street |
new gas connection for new development |
14/08/2024 8:00am |
30/08/2024 5:00pm |
South Tyneside Council |
low |
Kipling Avenue |
|
13/08/2024 12:00am |
14/08/2024 11:59pm |
Virgin Media |
low |
Bidd 4 |
|
07/08/2024 2:15pm |
13/08/2024 11:59pm |
Northumbrian Water |
low |
Benton Road |
|
09/08/2024 8:00am |
09/08/2024 6:00pm |
BT |
low |
Dean Road |
|
07/08/2024 12:30pm |
16/08/2024 11:59pm |
Northern Gas Networks |
medium |
Rear Of 58-230 Ocean Road |
|
12/08/2024 12:00am |
25/08/2024 11:59pm |
Northern Powergrid |
low |
Watson Street |
replace birds mouth fencing |
07/08/2024 1:00pm |
09/08/2024 5:00pm |
South Tyneside Council |
low |
Queens Crescent |
|
12/08/2024 12:00am |
13/08/2024 11:59pm |
Virgin Media |
medium |
Hartington Terrace |
|
09/08/2024 8:00am |
22/08/2024 5:00pm |
Grain Communications Ltd |
low |
Minster Parade |
fill pothole with bitmac- sweep up loose maestro |
08/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
medium |
Minster Parade |
fill pothole at gully with bitmac |
08/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
low |
Minster Parade |
sweep loose material and fill with bitmac |
08/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
low |
Minster Parade |
renew 3 x 0.900 |
08/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
low |
Grange Road |
renew concrete at base of pole 0.600x0.300 |
08/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
low |
Minster Parade |
relay 2 x 0.900 relay 2 x 0.600 cuts renew concrete fillet around BT box |
08/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
low |
Sheldon Street |
relay 6 x 450 flags and renew concrete fillet at BT box |
08/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
low |
Napier Street |
fill small pothole with bitmac |
08/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
low |
Minster Parade |
relay 3no 10x5 half bat kerbs relay 9 x 0.900 |
08/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
low |
Wilkinson Court |
repair kerb with rapid set mix |
08/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
low |
Moor Lane |
Reset 900mm flags: 7 Replace broken 900mm flags: 1 Reset 600mm flags: 12 Replace broken 600mm flag: 1 |
08/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
low |
Harold Street |
top up sunken tree pit with bitmac |
08/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
low |
Harold Street |
relay 2 x 10x5 bullnose kerb - bitmac footway way be required if kerb cannot be lowered due to tree roots. |
08/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
low |
Harold Street |
following kerb renewal surface course will need renewed 2.7x0.3, saw cutting required |
08/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
low |
Randolph Street |
relay 10 x granite kerbs renew 1 x 0.900 renew 1 x 0.600 relay 1 x 0.900 relay 1 x 0.600 renew concrete at CATV box 0.9x0.6 |
08/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
low |
Rear Of Marine Approach And Erskine Road |
back lane collapse, make safe with barriers |
06/08/2024 1:00pm |
03/09/2024 5:00pm |
South Tyneside Council |
medium |
Gaskell Avenue |
|
14/07/2024 2:30am |
07/08/2024 11:59pm |
Northern Powergrid |
high |
King George Road |
|
11/08/2024 12:00am |
11/08/2024 11:59pm |
Northumbrian Water |
low |
Coast Road |
Make safe to investigate underground cables and renew |
06/08/2024 10:00am |
09/08/2024 11:59pm |
South Tyneside Council |
low |
Eldon Street |
relay 4x0.750, 4x0.600, 3x0.900 |
07/08/2024 8:00am |
09/08/2024 5:00pm |
South Tyneside Council |
low |
Hylton Road |
relay 8 x 0.900 and 8 x 0.600 to ramp over tree roots. renew concrete fillet at gate 1.2 x 0.100 |
07/08/2024 8:00am |
09/08/2024 5:00pm |
South Tyneside Council |
low |
Don View |
|
05/08/2024 7:30pm |
09/08/2024 11:59pm |
Northumbrian Water |
low |
Moorlands |
|
09/08/2024 12:00am |
13/08/2024 11:59pm |
BT |
medium |
Fhed 71 |
|
08/08/2024 8:00am |
12/08/2024 6:00pm |
BT |
low |
Wagonway Road |
|
09/08/2024 8:00am |
13/08/2024 6:00pm |
Northern Powergrid |
medium |
Lincoln Way |
fill 3no potholes with bitmac |
07/08/2024 8:00am |
09/08/2024 5:00pm |
South Tyneside Council |
low |
Lincoln Way |
relay 1 x 0.900 renew concrete fillet |
07/08/2024 8:00am |
09/08/2024 5:00pm |
South Tyneside Council |
low |
Lincoln Way |
relay 9 x 0.600 relay 9 x 0.900 |
07/08/2024 8:00am |
09/08/2024 5:00pm |
South Tyneside Council |
medium |
Lincoln Way |
fill pothole with bitmac |
07/08/2024 8:00am |
09/08/2024 5:00pm |
South Tyneside Council |
low |
Broughton Road |
|
08/08/2024 12:00am |
09/08/2024 11:59pm |
Virgin Media |
low |
Westfield |
|
08/08/2024 8:00am |
09/08/2024 6:00pm |
BT |
low |
The Willows |
|
08/08/2024 8:00am |
09/08/2024 6:00pm |
BT |
low |
Rear Of Derwentwater Terrace And Chichester Road |
installation of 1 x pole with 20mph signage |
10/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
low |
Chestnut Close |
|
08/08/2024 8:00am |
09/08/2024 6:00pm |
BT |
low |
Linkway |
|
08/08/2024 8:00am |
09/08/2024 6:00pm |
BT |
low |
Rear Of 83 109 Chichester Road |
install 2 x poles and signs |
10/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
low |
Chichester Place |
installation of 2 x poles with 20mph signage, in footway |
10/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
low |
Kings Meadow |
|
08/08/2024 8:00am |
09/08/2024 6:00pm |
BT |
low |
West George Potts Street |
install 4 x poles and signs |
10/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
medium |
Heathway |
|
08/08/2024 8:00am |
09/08/2024 6:00pm |
BT |
low |
Rear Of Chichester Road |
install 2 x poles and signs |
10/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
medium |
Elberfeld Court |
|
05/08/2024 9:30am |
09/08/2024 11:59pm |
Northern Powergrid |
low |
Rear Of Wells Street |
|
08/08/2024 8:00am |
09/08/2024 6:00pm |
BT |
low |
Rear Of Imeary Street |
install 2 x poles and signs |
10/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
low |
Rear Of Imeary Street |
install 2 x poles and signs |
10/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
low |
West Stevenson Street |
installation of 2 x poles with 20mph signage |
10/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
medium |
Shaftesbury Avenue |
fill pothole with bitmac |
06/08/2024 8:00am |
08/08/2024 5:00pm |
South Tyneside Council |
medium |
Shaftesbury Avenue |
fill pothole with bitmac |
06/08/2024 8:00am |
08/08/2024 5:00pm |
South Tyneside Council |
low |
Brandling Court |
|
05/08/2024 9:00am |
09/08/2024 11:59pm |
Northern Powergrid |
medium |
Shaftesbury Avenue |
fill 3 potholes with bitmac |
06/08/2024 8:00am |
08/08/2024 5:00pm |
South Tyneside Council |
medium |
Shaftesbury Avenue |
fill pothole with bitmac |
06/08/2024 8:00am |
08/08/2024 5:00pm |
South Tyneside Council |
medium |
Monksway |
fill 2 potholes with bitmac |
06/08/2024 8:00am |
08/08/2024 5:00pm |
South Tyneside Council |
medium |
Shaftesbury Avenue |
remove any loose material and fill potholes with bitmac |
06/08/2024 8:00am |
08/08/2024 5:00pm |
South Tyneside Council |
medium |
Shaftesbury Avenue |
fill 2 potholes with bitmac |
06/08/2024 8:00am |
08/08/2024 5:00pm |
South Tyneside Council |
medium |
Cleadon Lane |
5 bitmap patches on footpath |
06/08/2024 8:00am |
08/08/2024 5:00pm |
South Tyneside Council |
high |
Front Street |
brush out and repair potholes along length of access road and fill fallen away edges |
06/08/2024 8:00am |
08/08/2024 5:00pm |
South Tyneside Council |
low |
Centenary Avenue |
|
05/08/2024 8:18am |
09/08/2024 11:59pm |
Northumbrian Water |
low |
Gaskell Avenue |
|
03/08/2024 12:16pm |
09/08/2024 11:59pm |
Northumbrian Water |
medium |
Rear Of South Frederick Street And John Williamson Street |
|
03/08/2024 9:06am |
09/08/2024 11:59pm |
Northumbrian Water |
medium |
Marina View |
|
03/08/2024 12:10am |
09/08/2024 11:59pm |
Northern Powergrid |
low |
John Clay Street |
installation of 2 x poles and 20mph signs in footway |
10/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
low |
Wawn Street |
installation of 2 x poles and 20mph signs in footway |
10/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
low |
West Stevenson Street |
installation of 2 x poles and 20mph signs in footway |
10/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
low |
Byron Street |
installation of 2 x poles and 20mph signs in footway |
10/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
low |
Milton Street |
installation of 2 x poles and 20mph signs in footway |
10/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
low |
Kelly Road |
renew 1.8x0.6 tarmac patch after flags have been relayed. saw required |
05/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
low |
West Avenue |
renew 1x0.900, 1x0.600 |
05/08/2024 8:00am |
09/08/2024 5:00pm |
South Tyneside Council |
low |
West Avenue |
relay 8x0.900, 8x0.750, renew 1x0.900 |
05/08/2024 8:00am |
09/08/2024 5:00pm |
South Tyneside Council |
medium |
Newcastle Road |
site investigation of the Newcastle Road Bridges to ascertain bridge parameters required for structural assessment. Assessment is required to determine whether structures
can accommodate a proposed abnormal load movement. Traffic management lane closures will be
required on both carriageways |
12/08/2024 9:00am |
16/08/2024 5:00pm |
South Tyneside Council |
low |
Rear Of Hedworth Lane |
|
08/08/2024 8:00am |
09/08/2024 6:00pm |
BT |
high |
Front Street |
|
08/08/2024 12:00am |
08/08/2024 11:59pm |
Northern Gas Networks |
low |
Toner Avenue |
relay 5 x 0.600 relay 3 x 0.900 |
02/08/2024 8:00am |
09/08/2024 5:00pm |
South Tyneside Council |
low |
Toner Avenue |
renew 1 x 0.750 relay 2 x 0.600 relay 2 x 0.750 excavated aged sunken concrete and renew with C30 repair 3 chipped kerbs with rapid |
02/08/2024 8:00am |
09/08/2024 5:00pm |
South Tyneside Council |
medium |
Commercial Road |
POC jointing, closing joints, final phase of works |
05/08/2024 8:00am |
12/08/2024 5:00pm |
South Tyneside Council |
low |
Fieldway |
|
06/08/2024 2:00pm |
08/08/2024 11:59pm |
BT |
low |
The Willows |
renew 1 no 0.900 and 1no 0.750 relay 3 x 0.900 and 3 x 0.750 |
31/07/2024 8:30am |
09/08/2024 5:00pm |
South Tyneside Council |
low |
Devon Road |
renew 2no 10x5 bullnose kerb. relay 1no 10x5 bullnose kerb. saw cutting required at rear of all three to enable a straight kerb edge |
31/07/2024 8:00am |
09/08/2024 5:00pm |
South Tyneside Council |
low |
Clyde Avenue |
renew 2 x 0.900 renew 2 0.750 relay 3 x 0.750 relay 3 x 0.900 relay 1 x 0.600 ensure flags are brushed in or pointed with sand/cement |
31/07/2024 8:00am |
09/08/2024 5:00pm |
South Tyneside Council |
low |
Clyde Avenue |
feather edge of flags after being relayed |
31/07/2024 8:00am |
09/08/2024 5:00pm |
South Tyneside Council |
low |
Galsworthy Road |
|
08/08/2024 8:00am |
12/08/2024 6:00pm |
BT |
medium |
Masefield Drive |
|
08/08/2024 8:00am |
12/08/2024 6:00pm |
BT |
low |
North Road |
|
07/08/2024 8:00am |
09/08/2024 6:00pm |
BT |
low |
Rectory Bank |
|
07/08/2024 8:00am |
09/08/2024 6:00pm |
BT |
low |
Simr 26 |
|
12/08/2024 7:30am |
23/08/2024 11:59pm |
Northern Gas Networks |
medium |
Campbell Park Road |
removal of existing pedestrian refuge and then renew and replace existing tactile crossings |
12/08/2024 8:00am |
30/08/2024 5:00pm |
South Tyneside Council |
low |
St Nicholas Terrace |
|
08/08/2024 8:00am |
09/08/2024 6:00pm |
BT |
high |
Imeary Street |
|
13/08/2024 8:00am |
19/08/2024 5:00pm |
Grain Communications Ltd |
low |
St Johns Avenue |
renew tarmac verge following flagging job 2.4x0.750 |
30/07/2024 9:30am |
08/08/2024 5:00pm |
South Tyneside Council |
low |
Hutton Street |
|
09/08/2024 8:00am |
09/08/2024 6:00pm |
O2 (UK) Limited |
medium |
Commercial Road |
|
06/08/2024 5:00pm |
19/08/2024 11:59pm |
CityFibre Metro Networks Ltd |
low |
Rectory Green |
|
09/08/2024 8:00am |
13/08/2024 6:00pm |
BT |
low |
St Nicholas Road |
|
09/08/2024 8:00am |
13/08/2024 6:00pm |
BT |
medium |
North Road |
|
09/08/2024 8:00am |
13/08/2024 6:00pm |
BT |
low |
Seton Avenue |
|
13/08/2024 12:00am |
15/08/2024 11:59pm |
Northern Powergrid |
medium |
Holder House Lane |
|
14/08/2024 9:30am |
14/08/2024 3:30pm |
Northern Gas Networks |
medium |
John Reid Road |
central reservation grass cutting and clean up |
10/08/2024 7:00am |
10/08/2024 12:00pm |
South Tyneside Council |
medium |
Ellison Street |
Demolition works taking place within the former Hawthorn Leslie shipyard. Pavement and lane incursions proposed as safety exclusion zones during the demolition period. |
12/08/2024 8:00am |
31/10/2024 5:30pm |
South Tyneside Council |
low |
Fenwick Avenue |
|
12/08/2024 12:00am |
14/08/2024 11:59pm |
Northern Powergrid |
low |
River Drive |
|
14/08/2024 12:00am |
20/08/2024 11:59pm |
Northumbrian Water |
low |
Sunderland Road |
|
08/08/2024 8:00am |
12/08/2024 6:00pm |
BT |
low |
Don View |
barrier off footway from 6-24 as dangerous |
24/07/2024 4:40pm |
27/09/2024 5:00pm |
South Tyneside Council |
medium |
Bywell Road |
|
07/08/2024 11:11am |
09/08/2024 6:00pm |
BT |
medium |
Gordon Road |
|
12/08/2024 8:00am |
09/09/2024 5:00pm |
Grain Communications Ltd |
low |
Newcastle Road |
|
12/08/2024 11:00am |
12/08/2024 2:00pm |
National Highways |
high |
Tasmania Road |
installation of back flow protection to allotments main water supply |
05/08/2024 8:00am |
09/08/2024 4:00pm |
South Tyneside Council |
low |
Stirling Avenue |
installation of back flow protection to allotments main water supply |
05/08/2024 8:00am |
09/08/2024 4:00pm |
South Tyneside Council |
low |
Westoe Road |
|
23/07/2024 9:53am |
12/08/2024 11:59pm |
Northern Gas Networks |
low |
Wilberforce Street |
|
09/08/2024 8:00am |
15/08/2024 11:59pm |
Northern Gas Networks |
low |
Prince Edward Road |
Removal of existing bins and replace with larger type bins |
12/08/2024 8:00am |
30/08/2024 5:00pm |
South Tyneside Council |
low |
Masefield Drive |
|
06/08/2024 8:00am |
08/08/2024 6:00pm |
BT |
low |
Jervis Street |
|
07/08/2024 8:11am |
13/08/2024 11:59pm |
Northumbrian Water |
medium |
Russell Street |
|
12/08/2024 8:00am |
19/08/2024 11:59pm |
Northern Gas Networks |
medium |
Temple Park Road |
|
24/07/2024 7:30am |
20/08/2024 11:59pm |
Northern Gas Networks |
low |
South Shields Footpath 420 |
|
09/08/2024 12:00am |
16/08/2024 11:59pm |
Northern Powergrid |
medium |
North Drive |
|
06/08/2024 2:45pm |
08/08/2024 6:00pm |
BT |
medium |
Bede Burn Road |
construction of a puffin crossing |
29/07/2024 8:00am |
14/08/2024 5:00pm |
South Tyneside Council |
medium |
Brownlow Road |
|
29/07/2024 8:00am |
23/08/2024 5:00pm |
Grain Communications Ltd |
medium |
Talbot Road |
|
12/08/2024 8:00am |
09/09/2024 5:00pm |
Grain Communications Ltd |
medium |
Wolsey Court |
|
23/07/2024 8:00am |
19/08/2024 5:00pm |
Grain Communications Ltd |
medium |
Egerton Road |
|
31/07/2024 9:00am |
28/08/2024 5:00pm |
Grain Communications Ltd |
medium |
Warwick Road |
|
08/08/2024 8:00am |
21/08/2024 5:00pm |
Grain Communications Ltd |
low |
South Shields Footpath 543 |
|
13/08/2024 7:30am |
10/09/2024 11:59pm |
Northern Gas Networks |
medium |
Lizard Lane |
|
13/08/2024 7:30am |
24/09/2024 11:59pm |
Northern Gas Networks |
medium |
Grotto Road |
|
13/08/2024 7:30am |
22/10/2024 11:59pm |
Northern Gas Networks |
medium |
Dale Street |
|
12/08/2024 12:00am |
25/08/2024 11:59pm |
Northern Powergrid |
medium |
Calf Close Lane |
|
30/07/2024 9:20am |
07/08/2024 11:59pm |
Global Utility Connections |
medium |
Grasmere Gardens |
|
24/07/2024 7:30am |
16/08/2024 11:59pm |
Northern Gas Networks |
medium |
Windermere Crescent |
|
24/07/2024 7:30am |
16/08/2024 11:59pm |
Northern Gas Networks |
low |
South Shields Footpath 422 |
|
09/08/2024 12:00am |
16/08/2024 11:59pm |
Northern Powergrid |
low |
Nicholas Avenue |
|
09/08/2024 12:00am |
15/08/2024 11:59pm |
Northern Powergrid |
medium |
Jarrow Road |
lane closures required for kerb drainage cleaning |
12/08/2024 9:00am |
16/08/2024 3:00pm |
South Tyneside Council |
low |
Westoe Road |
|
08/08/2024 7:30am |
14/08/2024 11:59pm |
Northern Gas Networks |
low |
Finchale Road |
remove concrete - renew with lean mix and bitmac 2.7x1.0 |
12/07/2024 8:00am |
16/08/2024 5:00pm |
South Tyneside Council |
low |
South Shields Footpath 1436 |
|
12/08/2024 12:00am |
30/08/2024 11:59pm |
Northern Gas Networks |
medium |
Laygate Street |
|
05/08/2024 3:48pm |
16/08/2024 11:59pm |
BT |
medium |
Lord Nelson Street |
excavate new Road Crossing and connection bay to install new LV mains for Keepmoat Homes New Development |
29/07/2024 9:00am |
16/08/2024 6:00pm |
South Tyneside Council |
low |
Boldon Lane |
drainage repairs to front and rear of businesses |
29/07/2024 8:00am |
09/08/2024 5:00pm |
South Tyneside Council |
low |
Primrose Terrace |
|
09/08/2024 12:00am |
15/08/2024 11:59pm |
Northumbrian Water |
medium |
Argyle Street |
|
02/08/2024 2:12pm |
15/08/2024 11:59pm |
Northumbrian Water |
medium |
Argyle Street |
|
01/08/2024 11:00am |
14/08/2024 11:59pm |
Northumbrian Water |
low |
Brownlow Road |
|
14/08/2024 12:00am |
20/08/2024 11:59pm |
Northern Powergrid |
low |
Durham Drive |
24-25 footway improvement works. Remove flags and new formation of concrete and bitmac wearing course |
13/08/2024 8:00am |
19/09/2024 5:00pm |
South Tyneside Council |
low |
Westmorland Road |
Take out grassed verge and extend layby - Priora block to match surrounding area |
12/08/2024 8:00am |
30/08/2024 5:00pm |
South Tyneside Council |
medium |
Stanhope Road |
new toucan crossing installation |
22/07/2024 8:00am |
30/08/2024 5:00pm |
South Tyneside Council |
medium |
Campbell Park Road |
Footway/crossing works and installation of 2 x tactile crossing points |
12/08/2024 8:00am |
20/09/2024 5:00pm |
South Tyneside Council |
medium |
Bede Burn Road |
installation of new puffin crossing |
29/07/2024 8:00am |
06/09/2024 5:00pm |
South Tyneside Council |
medium |
Lincoln Road |
renewal of kerb line and verge hardening |
10/07/2024 11:30am |
11/09/2024 5:00pm |
South Tyneside Council |
low |
Lukes Lane |
|
12/08/2024 12:00am |
14/08/2024 11:59pm |
BT |
high |
North Guards |
installation of zebra crossing with associated poles and signs and speed tables and drainage removal of build outs (nibs) |
12/08/2024 8:00am |
30/08/2024 5:00pm |
South Tyneside Council |
low |
South Shields Footpath 1437 |
|
05/08/2024 12:00am |
30/08/2024 11:59pm |
Northern Gas Networks |
medium |
Dean Terrace |
|
07/08/2024 9:11am |
13/08/2024 11:59pm |
Northumbrian Water |
medium |
Mowbray Road |
|
24/07/2024 2:00pm |
16/08/2024 5:00pm |
Grain Communications Ltd |
high |
Lake Shore Road |
installation of new sewers and gullies and associated drainage |
22/07/2024 8:00am |
29/09/2024 4:30pm |
South Tyneside Council |
high |
Leam Lane |
Cleanse and camera survey carrier drains, clean gullies, Mon to Fri 09.30 - 15.30; changing to 19:30-06:00 nightshift from 30/07 |
22/07/2024 9:30am |
30/08/2024 3:30pm |
South Tyneside Council |
low |
South Shields Footpath 1435 |
|
02/08/2024 7:30am |
22/08/2024 11:59pm |
Northern Gas Networks |
low |
South Shields Footpath 1433 |
|
02/08/2024 7:30am |
30/08/2024 11:59pm |
Northern Gas Networks |
low |
Temple Park Road |
|
02/08/2024 7:30am |
12/09/2024 11:59pm |
Northern Gas Networks |
low |
Compton Avenue |
|
02/08/2024 7:30am |
05/09/2024 11:59pm |
Northern Gas Networks |
medium |
Blyton Avenue |
|
02/08/2024 7:30am |
30/08/2024 11:59pm |
Northern Gas Networks |
medium |
Bisley Drive |
|
02/08/2024 7:30am |
05/09/2024 11:59pm |
Northern Gas Networks |
low |
Ascot Gardens |
|
02/08/2024 7:30am |
30/08/2024 11:59pm |
Northern Gas Networks |
low |
Larch Avenue |
flags to flexible scheme |
08/07/2024 8:00am |
16/08/2024 5:00pm |
South Tyneside Council |
low |
Burrow Street |
footway closure to allow demolition of building |
24/06/2024 8:00am |
30/08/2024 5:00pm |
South Tyneside Council |
high |
Laygate |
|
31/07/2024 9:55am |
09/08/2024 11:59pm |
Northern Gas Networks |
medium |
Cleadon Lane |
installation of zebra crossing with associated poles and signs |
22/07/2024 8:00am |
09/08/2024 5:00pm |
South Tyneside Council |
low |
Thornleigh Gardens |
flags to flexible |
08/07/2024 8:00am |
16/08/2024 5:00pm |
South Tyneside Council |
low |
Marigold Walk |
|
06/08/2024 7:30am |
19/08/2024 11:59pm |
Northern Gas Networks |
low |
Marigold Walk |
|
08/08/2024 7:30am |
20/08/2024 11:59pm |
Northern Gas Networks |
high |
Wenlock Road |
|
26/07/2024 7:30am |
30/08/2024 11:59pm |
Northern Gas Networks |
low |
Lisle Road |
CAF Works 23-24 Lisle Road F2F |
05/08/2024 8:00am |
30/08/2024 5:00pm |
South Tyneside Council |
medium |
Hedworth Lane |
|
05/08/2024 12:00am |
16/08/2024 11:59pm |
Northern Powergrid |
medium |
Henry Street |
concrete bay renewal |
15/07/2024 8:00am |
09/08/2024 5:00pm |
South Tyneside Council |
low |
Roman Road |
|
12/08/2024 7:30am |
23/08/2024 11:59pm |
Northern Gas Networks |
low |
Rear Of St Vincent Street |
make safe, back lane collapse |
30/05/2024 8:00am |
30/08/2024 5:00pm |
South Tyneside Council |
low |
Wood Terrace |
|
12/08/2024 7:30am |
23/08/2024 11:59pm |
Northern Gas Networks |
medium |
Harton Lane |
|
24/07/2024 7:30am |
20/08/2024 11:59pm |
Northern Gas Networks |
medium |
Rear Of 103-117 Victoria Road West |
|
12/08/2024 7:30am |
06/09/2024 11:59pm |
Northern Gas Networks |
medium |
Derby Crescent |
|
12/08/2024 7:30am |
06/09/2024 11:59pm |
Northern Gas Networks |
medium |
Clennell Avenue |
|
24/07/2024 9:40am |
13/08/2024 11:59pm |
Northern Gas Networks |
low |
West Parade |
|
17/07/2024 7:30am |
20/08/2024 11:59pm |
Northern Gas Networks |
low |
Hebs 29 |
|
12/08/2024 7:30am |
02/09/2024 11:59pm |
Northern Gas Networks |
high |
Victoria Road West |
|
08/07/2024 7:30am |
16/08/2024 11:59pm |
Northern Gas Networks |
high |
King George Road |
|
01/07/2024 7:30am |
09/08/2024 11:59pm |
Northern Gas Networks |
medium |
Kent Avenue |
|
08/07/2024 7:30am |
16/08/2024 11:59pm |
Northern Gas Networks |
low |
Bede 33 |
|
31/07/2024 7:30am |
20/08/2024 11:59pm |
Northern Gas Networks |
low |
The Circle |
renew 4ms of concrete outside number 37. renew 0.5sm of concrete outside number 3 and renew concrete 0.5m outside number 6. meet cmalley on site |
23/05/2024 10:30am |
30/08/2024 5:00pm |
South Tyneside Council |
high |
Lord Nelson Street |
installation of new sewers and associated drainage for new development |
20/05/2024 8:00am |
10/11/2024 5:00pm |
South Tyneside Council |
low |
Bede 31 |
|
16/07/2024 2:30pm |
09/08/2024 11:59pm |
Northern Gas Networks |
medium |
Lynton Avenue |
|
16/07/2024 2:30pm |
09/08/2024 11:59pm |
Northern Gas Networks |
low |
Bede 2 |
|
16/07/2024 2:30pm |
12/08/2024 11:59pm |
Northern Gas Networks |
medium |
Stanhope Road |
|
02/07/2024 10:43am |
09/08/2024 11:59pm |
Northern Gas Networks |
low |
Rear Of Broughton Road And Marine Approach |
to arrange barriers around depression pending investigation |
10/05/2024 2:00pm |
13/09/2024 5:00pm |
South Tyneside Council |
medium |
Rose Street |
|
26/06/2024 7:30am |
15/08/2024 11:59pm |
Northern Gas Networks |
medium |
Glen Street |
|
12/06/2024 7:30am |
22/08/2024 11:59pm |
Northern Gas Networks |
medium |
Bell Street |
Installation of new sewer to accommodate surface water outfall from new housing development |
01/07/2024 8:00am |
14/08/2024 5:00pm |
South Tyneside Council |
medium |
Argyle Street |
installation of new sewer to accommodate surface water outfall from new housing development |
12/08/2024 8:00am |
21/08/2024 5:00pm |
South Tyneside Council |
low |
Muirfield |
remove fence |
17/04/2024 7:45am |
27/09/2024 5:00pm |
South Tyneside Council |
medium |
Ebchester Street |
|
26/07/2024 7:30am |
22/08/2024 11:59pm |
Northern Gas Networks |
medium |
Blyton Avenue |
|
29/07/2024 12:00am |
23/08/2024 11:59pm |
Northern Gas Networks |
low |
West Holborn |
Footpath to be closed due to unsafe structures in the footpath path near the Port of Tyne boundary wall. This is to remain closed until further solutions are presented to remedy this. |
25/03/2024 8:00am |
25/09/2024 5:00pm |
South Tyneside Council |
low |
Cumberland Court |
|
04/06/2024 12:15pm |
14/08/2024 11:59pm |
Northern Gas Networks |
medium |
Tennant Street |
|
04/06/2024 12:15pm |
12/08/2024 11:59pm |
Northern Gas Networks |
high |
Victoria Road West |
|
22/07/2024 7:30am |
30/08/2024 11:59pm |
Northern Powergrid |
low |
High Sandgrove |
make safe area of unsafe wall to no18, footway closure required |
27/02/2024 2:00pm |
27/09/2024 5:00pm |
South Tyneside Council |
low |
Rede Street |
make safe dangerous structure |
08/02/2024 5:00pm |
23/08/2024 5:00pm |
South Tyneside Council |
high |
Coast Road |
kerbline realignment on the coastal side of the carriageway (moving into the carriageway itself).
There will also be a couple of ped crossing renewals |
13/11/2023 8:00am |
06/09/2024 5:00pm |
South Tyneside Council |