low |
Australia Grove |
|
12/09/2024 12:00am |
13/09/2024 11:59pm |
Virgin Media |
low |
Rosebery Avenue |
|
09/09/2024 11:30am |
13/09/2024 11:59pm |
Northern Powergrid |
low |
Moreland Road |
|
12/09/2024 12:00am |
12/09/2024 11:59pm |
Northumbrian Water |
low |
Nicholas Avenue |
|
09/09/2024 10:10am |
13/09/2024 11:59pm |
Northern Powergrid |
medium |
Perth Avenue |
fill potholes with bitmac- remove loose material first |
10/09/2024 8:00am |
12/09/2024 11:59pm |
South Tyneside Council |
low |
Perth Avenue |
relay 11 x 0.900 relay 9 x 0.600 mortar fillets required around 2 utility covers |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Woodside Way |
|
12/09/2024 12:00am |
13/09/2024 11:59pm |
Virgin Media |
low |
Perth Avenue |
relay 1 x 5x6 bullnose kerb |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
medium |
Perth Avenue |
fill pothole at gulley |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
medium |
Perth Avenue |
fill 2 x potholes and top up depression to remove exposed ironwork 0.9x0.9 |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
medium |
Perth Avenue |
fill 4 potholes with bitmac |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Perth Avenue |
renew 2x 0.900 saw cut required renew 1 x 0.600 relay 1 x 0.600 and 1 x 0.900 concrete fillet at edge of bitmac |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
medium |
Perth Avenue |
fill 5 potholes with bitmac |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
medium |
Perth Avenue |
fill depression with bitmac 2 x 0.6 |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Perth Avenue |
renew 1 x 0.900 and 1 x 0.600 renew 1 x tactile relay 5 x 0.600 relay 1 x 09.00 renew concrete fillets at 2 BT boxes |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
medium |
Perth Avenue |
fill potholes with bitmac |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
medium |
Perth Avenue |
fill 3 x ruts/depression in carriageway approx 4x1 each |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Ruskin Drive |
|
08/09/2024 1:55pm |
13/09/2024 11:59pm |
Northern Powergrid |
low |
Vespasian Street |
|
07/09/2024 2:00pm |
18/09/2024 11:59pm |
Northern Gas Networks |
low |
Brodie Close |
|
07/09/2024 9:04am |
18/09/2024 11:59pm |
Northern Gas Networks |
medium |
Rear Of Grays Terrace |
|
11/09/2024 8:00am |
13/09/2024 6:00pm |
BT |
low |
Mill Lane |
|
06/09/2024 2:39pm |
12/09/2024 11:59pm |
Northumbrian Water |
low |
Sandiacres |
|
11/09/2024 8:00am |
13/09/2024 6:00pm |
BT |
medium |
Perth Avenue |
fill pothole with bitmac |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Perth Avenue |
relay 1 x 0.600 and renew concrete fillet at CATV box |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Perth Avenue |
relay 2 x 0.600 |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Perth Avenue |
relay 1 x 0.600 |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
medium |
Perth Avenue |
fill depression with bitmac |
10/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Perth Avenue |
renew 1 x 0.900 saw cut relay 1 x 0.900 relay 1x 0.600 renew concrete 0.900x0.3 saw cutting |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Perth Avenue |
fill pothole with bitmac |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
medium |
Perth Avenue |
fill potholes/ depression with bitmac |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Perth Avenue |
relay 2 x 0.900 cuts relay 1 x 0.600 cut |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
medium |
Perth Avenue |
fill 3 potholes with bitmac |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
high |
Whitburn Road |
bitmac 2 potholes in carriageway |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Perth Avenue |
saw cut and excavate uneven S/C. renew 0.9x0.3 and 0.3 x 0.3 after flagging job |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
high |
Whitburn Road |
cut back and renew damaged flexible footway 5mx0.5m |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
medium |
Perth Avenue |
fill pothole with bitmac |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
high |
Whitburn Road |
bitmac 2 potholes in carriageway in channel |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
high |
Whitburn Road |
bitmac pothole in carriageway |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Aberdeen Drive |
renew concrete fillet at CATV box and repair kerb (rapid set ideally) |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Whitburn Road |
concrete damaged kerb 0.200 |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Whitburn Road |
reset 1no tactics tile paving stone in footway |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Whitburn Road |
cut back and renew damaged flexible footway 5mx0.5m |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Aberdeen Drive |
repair 2 x kerb with rapid set |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
medium |
Waterloo Square |
3 potholes |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Aberdeen Drive |
renew 1 x 0.600 renew 2 x 0.900 relay 3 x 0.600 relay 1 x 0.900 ensure any large gaps are pointed with mortar/concrete fillet |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Stanhope Parade |
small pothole in road |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Whitburn Road |
cut back and renew damaged flexible footway 1m2 |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Prim 27 |
replace 1 x 0.900 with C30 |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Whitburn Road |
reset kerb in footway |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Prim 27 |
remove 3 x 0.900 and replace with concrete |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Prim 27 |
replace 3 x 0.900 and 1 x 0.600 withC30 envelope 1 0.900 and relay |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Aberdeen Drive |
renew 1 x 0.900 relay 1 x 0.900 and 2 x 0.600 |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Perth Avenue |
top up 2 areas of depression |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Aberdeen Drive |
repair kerb with rapid set |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Perth Avenue |
top up verge with top soil |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Aberdeen Drive |
relay 1 x 0.900 and 1x0.600 on concrete |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Aberdeen Drive |
repair 2 kerbs with rapid set |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Perth Avenue |
relay 1 x 5x6 bullnose kerb repair 2 sections of damaged kerb with rapid set |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Aberdeen Drive |
renew 3 x 0.900 relay 2 x 0.600 |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
medium |
Perth Avenue |
renew gully cover |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Aberdeen Drive |
renew concrete around CATV box 0.6x0.6 |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
medium |
Perth Avenue |
fill pothole with bitmac and top up depression with bitmac |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
medium |
Rear Of Stanhope Road And Birchington Avenue |
|
06/09/2024 2:19pm |
12/09/2024 11:59pm |
Northumbrian Water |
low |
Perth Avenue |
remove loose concrete and replace with bitmac 1.2x0.3 |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Aberdeen Drive |
renew 1 x 0.900 relay 1 x 6000 |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Perth Avenue |
fill pothole with bitmac |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Aberdeen Drive |
renew concrete 0.600x0.150 |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Snowberry Grove |
remove tree base from tree |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Aberdeen Drive |
relay 1 x 0.900 |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Access Road To 247-373 Prince Edward Road |
reset 2no0.450 in footway |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Access Road To 247-373 Prince Edward Road |
reset 2 areas of paving 2no 0.450 and 5no 0.45 |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Tynedale Road |
replace damaged kerb and 1no0.900 with concrete |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Access Road To Simonside Primary School From Glasgow Road |
use rapid set to repair kerb |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Aberdeen Drive |
saw cut 4 areas and remove damaged surface course. total 1.5sqm |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
medium |
Durham Drive |
|
14/09/2024 9:30am |
15/09/2024 3:00pm |
BT |
low |
Ayr Drive |
saw cut and remove damaged bitmac and renew patch 3 x 0.4 |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Glasgow Road |
use rapid set to repair radius kerb |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Aberdeen Drive |
renew 1 x 0.900 - may need enveloped relay 1 x 10x5 bullnose kerb renew concrete fillet 0.6x0.150 |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Aberdeen Drive |
following kerb and flag job - renew surface course to remove any trips. saw cut to provide straight level edge |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Glasgow Road |
relay 1 x0.900 |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Gorse Avenue |
install access crossing and hard stand |
09/09/2024 8:00am |
20/09/2024 5:00pm |
South Tyneside Council |
low |
Cheshire Court |
|
10/09/2024 12:00am |
10/09/2024 11:59pm |
Northern Powergrid |
medium |
Sea Way |
|
06/09/2024 10:47am |
12/09/2024 11:59pm |
Northumbrian Water |
low |
Lawnsway |
|
16/09/2024 8:00am |
18/09/2024 6:00pm |
BT |
low |
Moor Lane |
|
16/09/2024 8:00am |
18/09/2024 6:00pm |
BT |
low |
Foss Way |
|
16/09/2024 12:00am |
18/09/2024 11:59pm |
Northumbrian Water |
low |
Meadowfield Drive |
reset 2no kerb and relay 1no 0.750 1no0.600 |
09/09/2024 8:00am |
11/09/2024 5:00pm |
South Tyneside Council |
low |
Meadowfield Drive |
reset kerb and renew 1no0.750 in footway |
09/09/2024 8:00am |
11/09/2024 5:00pm |
South Tyneside Council |
low |
Woodlands View |
renew concrete ramp 1.65x0.45 |
09/09/2024 8:00am |
11/09/2024 5:00pm |
South Tyneside Council |
low |
West Park Road |
reset 1 granite radius kerb , 2m strip of bitmac and dig out bitmac and replace over tree root |
09/09/2024 8:00am |
11/09/2024 5:00pm |
South Tyneside Council |
low |
Mull Grove |
remove loose bitmac and renew surface course |
09/09/2024 8:00am |
11/09/2024 5:00pm |
South Tyneside Council |
medium |
Monkton Road |
fill depression in carriageway with bitmac approx 4 sqm |
09/09/2024 8:00am |
11/09/2024 5:00pm |
South Tyneside Council |
low |
Finchale Road |
renew 2 x 0.900 renew 1 x 0.750 relay 1 x 0.750 renew concrete verge 1.5x0.9 |
09/09/2024 8:00am |
11/09/2024 5:00pm |
South Tyneside Council |
low |
Devon Road |
renew 3n0 10x5 bullnose kerb relay 4 bullnose kerb mortar fillets in joints between kerbs |
09/09/2024 8:00am |
11/09/2024 5:00pm |
South Tyneside Council |
high |
Rear Of Blagdon Avenue And Morpeth Avenue |
|
05/09/2024 1:02pm |
11/09/2024 11:59pm |
Northumbrian Water |
low |
Lizard Lane |
cut back and renew damaged flexible footway 0.5mx0.5m |
09/09/2024 8:00am |
11/09/2024 5:00pm |
South Tyneside Council |
low |
Fhed 18 |
|
10/09/2024 12:00am |
11/09/2024 11:59pm |
Virgin Media |
low |
Taunton Avenue |
renew 2 x 0.900 renew 1 x 0.600 relay 1 x 0.600 excavate and renew concrete approx 9sqm |
09/09/2024 8:00am |
11/09/2024 5:00pm |
South Tyneside Council |
low |
Moor Lane |
cut back and renew damaged flexible footway 5mx1.2m |
06/09/2024 8:00am |
10/09/2024 5:00pm |
South Tyneside Council |
low |
Moor Lane |
cut bsv, and renew damaged flexible footway 7mx1m |
06/09/2024 8:00am |
10/09/2024 5:00pm |
South Tyneside Council |
low |
Lumley Avenue |
|
05/09/2024 8:00am |
11/09/2024 11:59pm |
Northern Gas Networks |
medium |
Salem Street |
|
04/09/2024 1:55pm |
11/09/2024 11:59pm |
Northern Powergrid |
low |
Wharton Street |
|
04/09/2024 3:07pm |
13/09/2024 11:59pm |
Northern Gas Networks |
low |
Wood Terrace |
|
04/09/2024 3:01pm |
10/09/2024 11:59pm |
Northumbrian Water |
medium |
Thornleigh Gardens |
|
09/09/2024 8:00am |
10/09/2024 6:00pm |
BT |
low |
Ravensbourne Avenue |
|
10/09/2024 12:00am |
23/09/2024 11:59pm |
Virgin Media |
low |
Fhed 40 |
|
10/09/2024 12:00am |
12/09/2024 11:59pm |
Northumbrian Water |
high |
Langholm Road |
road closure at junction with station road in conjunction with closure on station road |
15/09/2024 8:00am |
06/10/2024 5:00pm |
South Tyneside Council |
low |
Station Road |
relay 2 x 10x5 bullnose kerb relay 5 x 0.600 relay 3 x 0.750 renew 1 x 0.600 relay 1 x 0.600x0.300 (replace with conc if required) renew 0.600x0.600 C30 renew missing fillet at BT box |
06/09/2024 8:00am |
10/09/2024 5:00pm |
South Tyneside Council |
medium |
Meadowfield Drive |
|
10/09/2024 12:00am |
11/09/2024 11:59pm |
BT |
low |
Fhed 32 |
saw cut footpath each side of raise bitmac and renew surface course 1.8x0.9 |
06/09/2024 8:00am |
10/09/2024 5:00pm |
South Tyneside Council |
low |
Mitford Road |
reset kerb and 1no 0.750 in footway |
06/09/2024 8:00am |
10/09/2024 5:00pm |
South Tyneside Council |
low |
Lyndon Drive |
|
09/09/2024 8:00am |
11/09/2024 5:00pm |
BT |
medium |
Commercial Road |
|
04/09/2024 9:50am |
10/09/2024 11:59pm |
Northern Powergrid |
low |
Ellison Street |
|
11/09/2024 12:00am |
13/09/2024 11:59pm |
Northern Powergrid |
low |
Windsor Gardens |
|
04/09/2024 9:43am |
10/09/2024 11:59pm |
Northumbrian Water |
medium |
Prince Consort Road |
|
04/09/2024 9:53am |
10/09/2024 11:59pm |
Northumbrian Water |
low |
Cornhill |
|
04/09/2024 9:52am |
10/09/2024 11:59pm |
Northumbrian Water |
low |
Durham Drive |
|
09/09/2024 8:00am |
10/09/2024 6:00pm |
BT |
low |
Durham Drive |
|
09/09/2024 8:00am |
10/09/2024 6:00pm |
BT |
low |
Cheviot Road |
|
04/09/2024 9:45am |
10/09/2024 11:59pm |
Northumbrian Water |
low |
Durham Drive |
|
09/09/2024 8:00am |
10/09/2024 6:00pm |
BT |
medium |
Laburnum Grove |
|
09/09/2024 8:00am |
10/09/2024 6:00pm |
BT |
low |
Chaucer Avenue |
|
12/09/2024 8:00am |
16/09/2024 6:00pm |
BT |
medium |
Marsden Road |
|
09/09/2024 8:00am |
11/09/2024 6:00pm |
BT |
medium |
West Drive |
|
11/09/2024 8:00am |
13/09/2024 6:00pm |
BT |
low |
Wawn Street |
|
03/09/2024 12:32pm |
12/09/2024 11:59pm |
Northumbrian Water |
low |
Marsden Lane |
reset 2no 0.750 3no 0.600 in footway |
05/09/2024 8:00am |
11/09/2024 5:00pm |
South Tyneside Council |
low |
Cook Close |
|
06/09/2024 1:53pm |
10/09/2024 5:00pm |
BT |
medium |
Henley Way |
Reset two gully cover and frames, inc patch surrounding tarmac, two-way temp lights |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Moreland Road |
|
11/09/2024 8:00am |
13/09/2024 5:00pm |
BT |
low |
King George Road |
reset footway 4.2mx2.4m and renew 1no0.900 |
04/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Bilton Hall Road |
|
09/09/2024 10:11am |
11/09/2024 11:59pm |
Virgin Media |
low |
Coast Road |
NPG to transfer supply to new feeder pillar |
11/09/2024 8:30am |
24/09/2024 11:59pm |
South Tyneside Council |
medium |
Aviemore Road |
|
03/09/2024 7:30am |
16/09/2024 11:59pm |
Northern Gas Networks |
low |
Coast Road |
NPG to transfer supply to feeder pillar |
11/09/2024 8:00am |
24/09/2024 11:59pm |
South Tyneside Council |
low |
Fort Street |
|
01/09/2024 3:45pm |
11/09/2024 11:59pm |
Northern Gas Networks |
medium |
Blyton Avenue |
|
09/09/2024 12:00am |
13/09/2024 11:59pm |
Northumbrian Water |
medium |
Hindmarch Drive |
|
13/09/2024 12:00am |
17/09/2024 11:59pm |
Virgin Media |
low |
Harton Grove |
|
30/08/2024 9:50am |
11/09/2024 11:59pm |
Northern Powergrid |
low |
Ede Avenue |
Access crossing - 6 kerb x 2.5m Grass x 1.5m Flags x 2.1m Grass - at left side of property when looking from the road |
16/09/2024 8:00am |
27/09/2024 5:00pm |
South Tyneside Council |
low |
Millais Gardens |
Access Crossing - 6 Kerb x 0.6m Flags |
12/09/2024 8:00am |
25/09/2024 5:00pm |
South Tyneside Council |
low |
West Avenue |
Access crossing - 4 kerb adjustment x 1.5 flags + 1.2 grass |
10/09/2024 8:00am |
23/09/2024 5:00pm |
South Tyneside Council |
medium |
Burdon Road |
|
13/09/2024 12:00am |
22/09/2024 11:59pm |
Northumbrian Water |
medium |
Barnes Road |
|
16/09/2024 12:00am |
27/09/2024 11:59pm |
CityFibre Metro Networks Ltd |
low |
Station Road |
|
16/09/2024 12:00am |
04/10/2024 11:59pm |
Northern Powergrid |
low |
Thornton Avenue |
|
13/09/2024 12:00am |
17/09/2024 11:59pm |
Virgin Media |
medium |
Garden Drive |
|
16/09/2024 12:00am |
18/09/2024 11:59pm |
Northumbrian Water |
medium |
Byron Avenue |
|
17/09/2024 12:00am |
23/09/2024 11:59pm |
Northumbrian Water |
low |
Westoe Road |
|
11/09/2024 12:00am |
13/09/2024 11:59pm |
BT |
low |
Fowler Street |
|
11/09/2024 12:00am |
13/09/2024 11:59pm |
BT |
low |
Prince Consort Lane |
|
02/09/2024 10:30am |
13/09/2024 11:59pm |
Northern Gas Networks |
low |
King Street |
|
11/09/2024 12:00am |
13/09/2024 11:59pm |
BT |
low |
King Street |
|
11/09/2024 12:00am |
13/09/2024 11:59pm |
BT |
medium |
Glen Street |
install new manhole chamber and pipe work |
09/09/2024 7:30am |
20/09/2024 6:00pm |
South Tyneside Council |
medium |
Rear Of Hartington Terrace And Canterbury Street |
|
16/09/2024 12:00am |
20/09/2024 11:59pm |
Northumbrian Water |
medium |
Rear Of George Scott Street And Lawe Road |
|
16/09/2024 12:00am |
20/09/2024 11:59pm |
Northumbrian Water |
low |
August Place |
|
16/09/2024 12:00am |
20/09/2024 11:59pm |
Northumbrian Water |
medium |
Mountbatten Avenue |
|
09/09/2024 9:25am |
11/09/2024 11:59pm |
Northumbrian Water |
low |
Gibson Court |
|
10/09/2024 8:00am |
12/09/2024 6:00pm |
BT |
low |
New Road |
|
10/09/2024 8:00am |
12/09/2024 6:00pm |
BT |
low |
Manet Gardens |
double access crossing (8 kerb) and hardstand (5.5 x 5) |
06/09/2024 8:00am |
20/09/2024 5:00pm |
South Tyneside Council |
low |
Milton Avenue |
|
11/09/2024 12:00am |
17/09/2024 11:59pm |
Northumbrian Water |
low |
Roman Road |
|
21/08/2024 1:38pm |
16/09/2024 11:59pm |
Northern Gas Networks |
low |
Adair Way |
|
12/09/2024 12:00am |
18/09/2024 11:59pm |
Northern Gas Networks |
low |
Richardson Avenue |
|
13/09/2024 12:00am |
19/09/2024 11:59pm |
Northern Powergrid |
medium |
Dean Road |
Installation of inductive detector loops on the carriageway |
13/09/2024 9:30am |
13/09/2024 3:30pm |
South Tyneside Council |
medium |
Whitburn Road |
Patching Works 24-25 - Whitburn Road Cleadon, 2 Way lights 09:00 - 17:00 |
16/09/2024 9:00am |
18/09/2024 5:00pm |
South Tyneside Council |
medium |
Forest Road |
|
12/09/2024 12:00am |
18/09/2024 11:59pm |
Northern Powergrid |
medium |
A1290 Washington Road Slip Roads East And West Of A19 |
lane closure required to facilitate the tm arrangement on thaeA1290/A19 slip road and downhill roundabout |
19/08/2024 8:00am |
06/12/2024 11:59pm |
South Tyneside Council |
medium |
Downhill Lane |
Single lane closure required to facilitate the TM arrangement on the A1290/A19 Slip Road & Downhill Roundabout |
19/08/2024 8:00am |
06/12/2024 11:59pm |
South Tyneside Council |
medium |
A1290 Washington Road Slip Roads East And West Of A19 |
Single lane closure required to facilitate the TM arrangement on the A1290/A19 Slip Road & Downhill Roundabout |
19/08/2024 8:00am |
06/12/2024 11:59pm |
South Tyneside Council |
low |
King George Road |
|
12/09/2024 12:00am |
18/09/2024 11:59pm |
Northumbrian Water |
low |
Ellison Street |
|
13/09/2024 12:00am |
19/09/2024 11:59pm |
Northern Powergrid |
low |
Rear Of Frederick Street |
|
21/08/2024 8:10am |
24/09/2024 11:59pm |
Northumbrian Water |
low |
South Frederick Street |
|
09/09/2024 12:00am |
20/09/2024 11:59pm |
CityFibre Metro Networks Ltd |
medium |
Rear Of Romilly Street And Bolingbroke Street |
|
05/09/2024 12:00am |
11/09/2024 11:59pm |
Northumbrian Water |
low |
Queen Street |
|
09/09/2024 2:06pm |
13/09/2024 11:59pm |
Northumbrian Water |
high |
Addison Road |
|
16/09/2024 7:30am |
19/11/2024 11:59pm |
Northern Gas Networks |
low |
Western Terrace |
|
16/09/2024 7:30am |
04/10/2024 11:59pm |
Northern Gas Networks |
low |
Mill View |
|
02/09/2024 9:00am |
18/10/2024 11:59pm |
Northern Gas Networks |
medium |
Mortimer Road |
|
04/09/2024 8:00am |
17/09/2024 5:00pm |
Grain Communications Ltd |
high |
Stanhope Road |
|
10/09/2024 8:00am |
16/09/2024 5:00pm |
Grain Communications Ltd |
low |
Concorde Way |
|
14/08/2024 10:32am |
11/09/2024 11:59pm |
Northern Gas Networks |
high |
Sea Road |
|
12/09/2024 12:00am |
12/09/2024 11:59pm |
Northumbrian Water |
low |
Fallow Road |
|
09/09/2024 7:30am |
20/09/2024 11:59pm |
Northern Gas Networks |
low |
Heworth Court |
|
29/08/2024 12:21pm |
11/09/2024 11:59pm |
Northern Gas Networks |
medium |
Marlborough Street North |
|
04/09/2024 3:15pm |
10/09/2024 5:00pm |
Grain Communications Ltd |
low |
Hall Gardens |
|
27/08/2024 9:10am |
11/10/2024 11:59pm |
Northern Gas Networks |
medium |
St Johns Terrace |
|
05/09/2024 9:00am |
13/09/2024 6:00pm |
Northern Powergrid |
low |
Rear Of Imeary Street |
|
30/08/2024 8:00am |
12/09/2024 5:00pm |
Grain Communications Ltd |
medium |
Canterbury Street |
|
09/09/2024 9:30am |
13/09/2024 5:00pm |
Grain Communications Ltd |
medium |
Holystone Industrial Estate |
installation of new gas main for new development |
02/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
medium |
Oxford Street |
|
11/09/2024 8:00am |
17/09/2024 5:00pm |
Grain Communications Ltd |
medium |
Collingwood Street |
|
11/09/2024 8:00am |
17/09/2024 5:00pm |
Grain Communications Ltd |
medium |
Mile End Road |
|
16/09/2024 8:00am |
27/09/2024 11:59pm |
Northern Gas Networks |
low |
Rear Of Marine Approach And Erskine Road |
back lane collapse, make safe with barriers |
06/08/2024 1:00pm |
04/10/2024 5:00pm |
South Tyneside Council |
medium |
Coronation Street |
|
15/09/2024 12:00am |
15/09/2024 11:59pm |
Northumbrian Water |
low |
Bamburgh Avenue |
|
13/09/2024 12:00am |
19/09/2024 11:59pm |
Northern Powergrid |
low |
Lynton Avenue |
|
09/09/2024 10:27am |
13/09/2024 11:59pm |
Northern Gas Networks |
low |
Price Street |
|
16/09/2024 8:00am |
27/09/2024 11:59pm |
Northern Gas Networks |
low |
Croft Terrace |
|
16/09/2024 8:00am |
27/09/2024 11:59pm |
Northern Gas Networks |
medium |
Ellison Street |
Demolition works taking place within the former Hawthorn Leslie shipyard. Pavement and lane incursions proposed as safety exclusion zones during the demolition period. |
12/08/2024 8:00am |
31/10/2024 5:30pm |
South Tyneside Council |
medium |
Prince Consort Road |
|
16/09/2024 12:00am |
24/09/2024 11:59pm |
Northern Powergrid |
low |
Don View |
barrier off footway from 6-24 as dangerous |
24/07/2024 4:40pm |
29/11/2024 5:00pm |
South Tyneside Council |
medium |
Gordon Road |
|
13/08/2024 2:00pm |
16/09/2024 5:00pm |
Grain Communications Ltd |
medium |
Station Road |
|
17/09/2024 12:00am |
30/09/2024 11:59pm |
Northern Powergrid |
medium |
Bell Street |
|
11/09/2024 12:00am |
19/09/2024 11:59pm |
Northern Powergrid |
medium |
Coquet Street |
|
10/09/2024 12:00am |
18/09/2024 11:59pm |
Northern Powergrid |
medium |
Argyle Street |
|
05/09/2024 12:00am |
13/09/2024 11:59pm |
Northern Powergrid |
medium |
Talbot Road |
|
12/08/2024 8:00am |
13/09/2024 5:00pm |
Grain Communications Ltd |
low |
South Shields Footpath 543 |
|
09/09/2024 7:30am |
04/10/2024 11:59pm |
Northern Gas Networks |
medium |
Lizard Lane |
|
09/09/2024 7:30am |
18/10/2024 11:59pm |
Northern Gas Networks |
medium |
Grotto Road |
|
09/09/2024 7:30am |
15/11/2024 11:59pm |
Northern Gas Networks |
low |
Wallington Grove |
|
29/08/2024 9:43am |
11/09/2024 11:59pm |
Northern Powergrid |
medium |
Morpeth Avenue |
|
02/09/2024 9:47am |
13/09/2024 11:59pm |
Northern Powergrid |
low |
Finchale Road |
remove concrete - renew with lean mix and bitmac 2.7x1.0 |
12/07/2024 8:00am |
20/09/2024 5:00pm |
South Tyneside Council |
low |
Access Road To 107-141 Hedworth Lane |
|
16/09/2024 8:00am |
23/09/2024 11:59pm |
Northern Gas Networks |
low |
Durham Drive |
24-25 footway improvement works. Remove flags and new formation of concrete and bitmac wearing course |
09/09/2024 8:00am |
15/10/2024 5:00pm |
South Tyneside Council |
medium |
Lincoln Road |
renewal of kerb line and verge hardening |
10/07/2024 11:30am |
11/09/2024 5:00pm |
South Tyneside Council |
low |
Ferry Street |
|
09/09/2024 10:50am |
13/09/2024 11:59pm |
Northumbrian Water |
high |
Lake Shore Road |
installation of new sewers and gullies and associated drainage |
22/07/2024 8:00am |
29/09/2024 4:30pm |
South Tyneside Council |
low |
Temple Park Road |
|
02/08/2024 7:30am |
12/09/2024 11:59pm |
Northern Gas Networks |
low |
Larch Avenue |
flags to flexible scheme |
02/09/2024 8:00am |
11/10/2024 5:00pm |
South Tyneside Council |
medium |
Sunderland Road |
installation of a puffin crossing |
19/08/2024 8:00am |
27/09/2024 5:00pm |
South Tyneside Council |
low |
Prince Edward Road |
|
09/09/2024 8:38am |
20/09/2024 11:59pm |
Northern Powergrid |
low |
Quarry Road |
|
27/08/2024 2:45pm |
13/09/2024 11:59pm |
Northern Gas Networks |
low |
The Circle |
renew 4ms of concrete outside number 37. renew 0.5sm of concrete outside number 3 and renew concrete 0.5m outside number 6. meet cmalley on site |
23/05/2024 10:30am |
20/09/2024 5:00pm |
South Tyneside Council |
low |
Rear Of Broughton Road And Marine Approach |
to arrange barriers around depression pending investigation |
10/05/2024 2:00pm |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Hedgeley Road |
|
27/08/2024 9:00am |
13/09/2024 11:59pm |
Northern Gas Networks |
medium |
Lynton Avenue |
concrete bay renewal programme, priority working |
05/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
Muirfield |
remove fence |
17/04/2024 7:45am |
27/09/2024 5:00pm |
South Tyneside Council |
low |
West Holborn |
Footpath to be closed due to unsafe structures in the footpath path near the Port of Tyne boundary wall. This is to remain closed until further solutions are presented to remedy this. |
25/03/2024 8:00am |
25/09/2024 5:00pm |
South Tyneside Council |
high |
Victoria Road West |
|
22/07/2024 7:30am |
18/10/2024 11:59pm |
Northern Powergrid |
low |
High Sandgrove |
make safe area of unsafe wall to no18, footway closure required |
27/02/2024 2:00pm |
27/09/2024 5:00pm |
South Tyneside Council |
low |
Rede Street |
make safe dangerous structure |
08/02/2024 5:00pm |
29/11/2024 5:00pm |
South Tyneside Council |
high |
Coast Road |
kerbline realignment on the coastal side of the carriageway (moving into the carriageway itself).
There will also be a couple of ped crossing renewals |
13/11/2023 8:00am |
13/12/2024 5:00pm |
South Tyneside Council |