Large Greenbelt Release: Aimsun Testing (2021)
About this publication
The South Tyneside Infrastructure Study, undertaken by SYSTRA on behalf of Highways England in 2019, tested the impact of South Tyneside's Local Plan on the Strategic Road Network (SRN).
This study will use the South Tyneside Infrastructure Study model and includes one of the proposed schemes at Jarrow tested in the A19 / A185 Jarrow Junction Study.
Publishing information
From: Spatial Planning team (produced by Systra)
Published: 25 May 2021
Local Plan reference: INV8
Documents
PDF: Large Greenbelt Release - Aimsun Testing 2021 (PDF, 977 KB)
This file has not been produced by South Tyneside Council, and may not be suitable for users of assistive technology. If you need help to access this information within this file, please get in touch to request an accessible format.