Level 2 Strategic Flood Risk Assessment: Scoping Report (2023)


About this publication

This document contains the Level 2 strategic flood risk assessment scoping report.

This document is required for nine potential development sites located at the Port of Tyne.

It builds on the Level 1 Strategic Flood Risk Assessment (SFRA) prepared in September 2023, and is required to help determine whether these sites can be safe for their lifetime and subsequently be allocated in South Tyneside Council's local plan.


Publishing information

From: JBA Consulting

Published: 14 December 2023


Documents

PDF:  Strategic Flood Risk Assessment Scoping Report (2023) (PDF) [420KB]

This file may not be suitable for users of assistive technology. If you need help to access this information within this file, please get in touch to request an accessible format.