South Tyneside Interim HRA and SPD: Report 2 - Recreation Mitigation Strategy (2018)
About this publication
This report is a Recreation Mitigation Strategy, prepared in response to an interim Habitats Regulations Assessment (HRA) of the emerging growth scenarios and options for South Tyneside.
The HRA has been undertaken in the early stages of the preparation of the new Local Plan for South Tyneside, in recognition of the risks posed to European wildlife sites as a result of new growth in the borough.
This mitigation strategy is an interim approach, setting the foundations for a refined strategy once the Local Plan has been prepared.
Publishing information
From: Footprint Ecology
Published: 6 February 2018
Local Plan reference: PRE52
Documents
PDF: South Tyneside interim HRA and SPD - Report 2 - mitigation strategy - consultation (PDF, 4 MB)
This file has not been produced by South Tyneside Council, and may not be suitable for users of assistive technology. If you need help to access this information within this file, please get in touch to request an accessible format.